| Project | New Saale Bridge near Hammelburg
|
| Location | On the B27 over the Franconian Saale river at Hammelburg
|
| Purpose | The new bridge is called for because the existing structure can no longer cope with the volume of traffic.
|
| Formwork systems | - NOEratio beam formwork
- NOEplast textured formliners
|
| Special features | In order to complete the works within the tight schedule, contractor Arlt called on a special NOE service: the textured formliners were premounted onto NOEratio beam formwork and delivered to site ready for immediate use.
|
Detailed design
| Staatliches Bauamt Schweinfurt |
| Construction planning and structure | ARLT Bauunternehmen GmbH, Frankenhain
|