Eye-catching form of bridge near Chemnitz

   

Project data

ProjectRoad to the South-East

LocationChemnitz/Adelsberg

PurposeTo carry the enormous increase in traffic volume.

Formwork systems
  • NOEratio
  • NOEtop R 275 circular formwork


Special featuresUnconventional design. Two differently shaped abutments, one with straight and one with rounded wing walls, were required because the carriageway had to be widened on one side.

ClientLandesamt für Straßenbau und Verkehr, Plauen Office, 08523 Plauen

Main contractorARTL Bauunternehmen GmbH, 04654 Frohbrug, OT Frankenhain


"NOE-Schaltechnik performed all of the formwork planning and design for us and assembled the formwork elements from the various system components in its factory. All we had to do on site was put the elements together. This made our work much easier”
Jan Höpping, Site Project Manager for ARLT