Bridge construction on the A12 motorway

   

Project data

ProjectSeries of new bridges

Completion2008

LocationBridges on the A12 motorway between Storkow and Fürstenwalde

PurposeThe motorway has been extensively redesigned to be adequate for higher traffic volumes.

Formwork systems
  • NOE H20 beam formwork combined with NOEtop R 275 circular formwork


Special featuresAll eight new overbridges must be constructed adjacent to the existing bridges. Therefore, there is very little room for formwork and falsework.

Main contractor A consortium consisting of
Arikon Bau
Max Bögl
DIW Bau


"I can only speak highly of the service we received from NOE. The Cottbus branch kept us supplied with helpful data and information, such as detailed formwork drawings and equipment return lists with loading drawings.”
Site Foreman, Mr Mittag