Swiss Life Arena Zurich

Concrete curtain wall façade for the ZSC Lions Arena

More than 200 concrete pouring sections, over 50 formliners in various shapes and sizes – the Swiss Life Arena in Zurich-Altstetten is the largest single project to date for NOEplast formliners worldwide. Exposed concrete façades in cast-in-place concrete, seamless, with a curtain-like texture and glass portholes.

Find out more

The façades of the Swiss Life Arena

200 concrete pouring sections, 50 formliners, a one-off project

Façades are the first thing a building reveals about itself. At the Swiss Life Arena in Zurich, the façade is more than just a shell – it is both the building’s visual identity and a source of atmosphere, as well as a masterpiece of craftsmanship. Concave waves along the long sides, a curtain-wall structure with glass portholes approximately 2.00 m in diameter on the north and south façades – all in cast-in-place concrete, without precast elements and without visible joints. The surface texture is created entirely using NOEplast formliners.

An overview of completed concrete façades

The project in detail

The concrete curtain

The north and south façades of the arena are characterised by a concrete structure reminiscent of a curtain – featuring glass portholes approximately 2.00 m in diameter. Constructed from cast-in-place concrete, seamless, without any precast elements.

On the construction site

More than 200 concrete pouring sections, up to 21.70 m long and 11.59 m high. Over 50 forms measuring up to 1.76 × 3.42 m and weighing 590 kg. Forms with formliners 5 and 7 mm wide – sealed with NOEplast filler material.

A one-off project

NOE produced around 45 moulds and delivered over 200 formliners in more than 40 lorry loads. This was the largest single order for NOEplast formliners – no comparable reference project has been found anywhere in the world.

There is no comparable project anywhere in the world

„To prepare for this task, we looked for similar projects. However, we couldn’t find a comparable project anywhere in the world. That’s why I’m extremely proud that we’re making such good progress with the work.“

Marcel Lappert, Project Manager, ARGE ZSC Arena

Further references

Search

Find the content you’re looking for quickly.
Browse pages, products and news.