Schiller Quarter

Completed projects

Find out more

Gallery

Award-winning ensemble

NOE Reference – Schillerquartier

Award-winning ensemble

A skilful combination of different formwork systems

Three residential buildings, each with a mixed-use function, are currently under construction in Mönchengladbach. The complex is intended to help create affordable housing. To ensure the project is carried out efficiently and safely, CQ-Haus GmbH opted for a range of NOE formwork systems.

In the North Rhine-Westphalian city of Mönchengladbach – more specifically, in the immediate vicinity of the main railway station and the Gründerzeit district of Eicken – three new residential and commercial buildings are being constructed on a site covering 29,000 m². They were honoured at Expo Real 2021 with the „ICONIC Award 2021“ for architecture and design in the „Innovative Architecture – Urban Planning“ category. One reason for this was undoubtedly that the architects always kept the surroundings of the building complex in mind whilst designing it. This is because the Eicken district is characterised by its Gründerzeit architecture, which is distinguished by its subdivision into plots, bay windows and small-scale design. The diversity of the residents and a vibrant arts and culture scene also contribute to the neighbourhood’s charm. The planners sought to reflect this character in the building complex.

NOE Reference – Schillerquartier

Building design

They drew on features of the Gründerzeit-era buildings and translated these into a modern design language. For example, they divided the buildings into sections, thereby aiming for a layout that corresponds to the existing structure, so as to create a unified overall appearance. All three buildings house flats as well as other uses. However, these vary from building to building. The first also houses a supermarket. The second offers space for social interaction and is intended to serve as an open venue for events and activities. And the third building features individually designed retail spaces on the ground floor for arts and crafts, start-ups and other innovative projects. A total of 157 flats are being created, ranging in size from 30 m² to over 80 m². They offer a high standard of comfort and are accessible.

NOE Reference – Schillerquartier

Different construction methods

The developer of the building complex is CQ-Haus GmbH, a subsidiary of the DBMC Group from the Netherlands, which has extensive experience in residential construction. It has also taken on project management and, in this context, commissioned the Dutch subsidiary of NOE-formwork technology to find a solution for the construction of a concrete basement. The project managers opted for a hollow-wall solution. To ensure that the construction process ran smoothly, NOE supplied the necessary props and scaffolding. At the same time, the company was asked to design the floor slabs and walls for other parts of the building. Originally, CQ-Haus had planned to use a filigree slab for the ground floor slab. However, after this idea had to be rejected for structural reasons, the NOE staff suggested constructing the ground floor and first-floor slabs using NOEdeck instead.

NOE Reference – Schillerquartier

Efficient slab formwork

This is a modular drop head system that is particularly well suited to formwork for large slab areas and offers a high degree of flexibility. Very few individual components are required for its assembly. This means that just 1.6 components are needed to formwork one square metre of slab area! As all NOEdeck components are made of aluminium, they are correspondingly lightweight. This makes them considerably easier to use. Intelligent, system-integrated fittings and levelling components also allow the formwork to be easily adapted to on-site conditions. A key advantage of the system is that the slab panels can be removed and reused elsewhere, whilst the props remain in place until the concrete has set. This minimises the number of components required on the construction site.

NOE Reference – Schillerquartier

Unilateral tension

The NOEtop4 – the manufacturer’s latest wall formwork system – was chosen for erecting the ground floor walls. Its distinctive feature is its conical anchor rod. This offers the advantage that the formwork can be braced entirely from one side, eliminating the need for work on the side where it is erected. This simplifies assembly, which proves particularly helpful in hard-to-reach areas. As a result, only one person – rather than two, as was previously the case – is now required to erect the formwork. Furthermore, dismantling is also extremely safe. This is because, with some systems featuring single-sided tension rod assembly, there may be exceptional cases where the fixed bearing can only be removed using heavy-duty tools. This usually results in damage to the formwork panel. To prevent this, the manufacturer has fitted the NOEtop4 with a removable fixed bearing. Once a locking pin has been released, it can be easily unscrewed, allowing the tension rod to be reliably released as soon as the formwork panel has been removed. With its standard height of 3.00 or 3.60 m, the new wall formwork reflects the trend towards ever-higher rooms. At the same time, the system still offers all the advantages for which the tried-and-tested NOEtop wall formwork has long been renowned. For example, the NOEtop4 is also hot-dip galvanised on both the inside and outside. In this way, the innovative system helps the Company’s staff to erect the walls quickly.

NOE Reference – Schillerquartier

To great heights

The NOEtop4 – the manufacturer’s latest wall formwork system – was chosen for erecting the ground floor walls. Its distinctive feature is its conical anchor rod. This offers the advantage that the formwork can be braced entirely from one side, eliminating the need for work on the side where it is erected. This simplifies assembly, which proves particularly helpful in hard-to-reach areas. As a result, only one person – rather than two, as was previously the case – is now required to erect the formwork. Furthermore, dismantling is also extremely safe. This is because, with some systems featuring single-sided tension rod assembly, there may be exceptional cases where the fixed bearing can only be removed using heavy-duty tools. This usually results in damage to the formwork panel. To prevent this, the manufacturer has fitted the NOEtop4 with a removable fixed bearing. Once a locking pin has been released, it can be easily unscrewed, allowing the tension rod to be reliably released as soon as the formwork panel has been removed. With its standard height of 3.00 or 3.60 m, the new wall formwork reflects the trend towards ever-higher rooms. At the same time, the system still offers all the advantages for which the tried-and-tested NOEtop wall formwork has long been renowned. For example, the NOEtop4 is also hot-dip galvanised on both the inside and outside. In this way, the innovative system helps the Company’s staff to erect the walls quickly.

Good cooperation

To ensure that the right system was always used for every construction task, NOE Netherlands’ staff provided constant support to the company and the project management team. In doing so, they worked closely with the technical office in Mönchengladbach. Whilst NOE was initially only involved in the construction of the first phase, the excellent cooperation meant that the formwork supplier was also commissioned for the next phase. A company cannot receive higher praise than that.