The exhibition grounds in Offenburg are being expanded to include a new hall. This hall is characterised by its elegant design and exceptionally high walls. For the concrete works, the company relied on components from NOE formwork technology.
A new building covering approximately 7,000 m² is currently under construction at the southern end of the Offenburg exhibition centre; it adjoins the Baden-Arena, which is around 15 years old, and forms the southern entrance. The building comprises three structures of varying heights and is characterised by its delicate design. As the premises are to be used not only for trade fairs but also for other events, the planners placed great emphasis on maximum flexibility. Accordingly, they designed the foyer with a large glazed façade. The main hall itself, with a floor area of almost 5,000 m², is characterised by walls and slab areas that are completely opaque.
The building’s enormous ceiling heights are truly impressive. It was precisely these that repeatedly posed major challenges for the company, Rendler Bau from Offenburg. The exhibition hall itself has a clear height of approximately 19 metres. To construct it, those in charge opted for two different methods: Three walls were constructed using precast reinforced concrete columns and hollow-core reinforced concrete elements filled with concrete. The fourth wall – the foyer wall, which forms part of the bracing core and includes a grandstand recess – was constructed conventionally using cast-in-place concrete. In doing so, the renowned construction firm Rendler Bau – as it has done for over 25 years – relied on NOE formwork technology. The construction firm has around 2,500 m² of the classic NOEtop wall formwork with plastic formwork facings in its own inventory. One reason for this is its durability – all frames and profiles are hot-dip galvanised on both the inside and outside. Furthermore, the system is extremely versatile and can be used equally well as frame formwork and girder formwork. The clamping points can be positioned as required. All panels have a uniform profile thickness and are fitted with cast corners. The elements are available in many different sizes – for example, in the XXL version. This has a height of 5.30 m and a width of 2.65 m, making it one of the largest formwork panels on the market. As it enables areas of more than 14 m² to be formworked in a single operation, it is ideal for efficient and cost-effective working. This is an advantage that Rendler also utilised throughout the lower section of the exhibition hall.
However, the hall wall, which adjoins the foyer directly, posed a far greater structural challenge for the company: as the loads from the foyer staircase are transferred in a structurally very complex manner, this wall could not be constructed in the same way as the other three. Instead, the contractor first had to erect a 10.33 m high wall section, then create the slab offset above the grandstand support, and finally construct the remaining approximately 9 m high section of the wall, including the edge beam. However, it is not quite so straightforward to safely formwork such large wall surfaces with a height of up to 10.33 m. To ensure a safe solution, the temporary push-pull props for the 10.33 m high lower section of the wall were positioned inside the hall – this allowed them to be secured to the slab at their base. They were also stabilised using heavy concrete blocks. For the formwork operations on the upper 9-metre-high section, the Rendler site team deployed the NOEtopS platform and positioned it on the heavy-duty scaffolding cantilever platform attached to the exterior. The NOEtop S platform is a complement to the NOEtop system and has the advantage that all working platforms, access ladders and push-pull props are mounted directly onto the formwork panels. Thanks to these elements, the formwork practically stands on its own. The NOEtop S platform arrives at the construction site ready for use and simply needs to be unfolded. It is available in widths of 1.325 m and 2.65 m and can be combined seamlessly with standard NOEtop formwork, whilst offering the major advantage of making work extremely safe.
The exhibition stand structure is very tall and has hardly any bracing walls. This repeatedly presented Rendler with challenges that are rarely encountered in construction. For example, 4.5-metre-high steel truss elements on the 19-metre-high columns provide horizontal bracing for the structure. As a result, the walls between the columns were not adequately braced until the roof structure had been fully completed.
Earthquake resistance
Offenburg is situated in earthquake zone 2. This means that earthquakes are certainly possible. As this had to be taken into account in the structural analysis, the start of construction was unexpectedly delayed by around half a year. Nevertheless, thanks to a great deal of dedication on the part of Rendler Bau and the active support of NOE formwork technology, the company managed to meet the deadline. This is a remarkable achievement given the various challenging construction tasks involved.