Dream team: standard & special formwork in combination

   

Project data

Project

“Überleiter 6” at Klein-Partwitz


LocationLusatian Lake District between Berlin and Dresden

PurposeThis area is becoming increasingly popular for leisure, which has called for an upgrade of the infrastructure.

Formwork systems
  • NOE H20 beam formwork


Special featuresA particularly interesting part of the “Überleiter 6” canal link is a localised combination of a bridge, lock and fish ladder. A challenging feature of this combination was the construction of the hollow box bridge deck. Although the project management originally assumed that many special formwork elements would be necessary because of the walls and the edge cantilevers, the NOE team managed to reduce the need for these types of individual solutions to minimum.

Main contractor

Arge Überleiter 6 consisting of BauCom

Bautzen GmbH, 02625 Bautzen

DIW Bau GmbH, 01917 Kamenz


"The NOE formwork design was of great help to us on site and played a large role in being able to finish the works ahead of the scheduled programme.”
Mr Koppisch, Construction Manager for DIW Bau GmbH