Albabstieg Tunnel, Dornstadt Portal

   

Project data

ProjectAlbabstieg Tunnel, Dornstadt Portal

LocationDornstadt

Formwork systems
  • NOEtec formwork carriage
  • NOEtop  large-area panels
  • NOEaluL wall formwork


Special featuresAfter concreting the first tube, the formwork carriage is removed and set up in the second tube of the cut-and-cover structure. In a well-planned logistics masterclass, the relocation took only 15 minutes, thus saving considerable time and money.

Client
Deutsche Bahn AG represented by DB Projekt Stuttgart-Ulm GmbH

Main contractor

Arge Tunnel Albabstieg

Ed. Züblin AG, Direktion Tunnelbau

Max Bögl Stiftung & Co.KG Zentralbereich Tunnelbau